Abstract

PurposeThe quality of construction projects is mainly dependent on the process quality during the construction phase than product quality. The key factors that influence the process quality of building projects in Pakistan during the construction phase of building life cycle are evaluated from literature. This paper aims to discuss these issues.Design/methodology/approachThe factors were ranked using the traditional relative importance index (RII) and the second synthetic grey relational analysis method. The findings indicate that during the construction phase the selection of an appropriate contractor is the most important factor. The existence of feedback system and quality of shop drawings received from subcontractors are also very significant factors, according to the grey relational model.FindingsMeasures for the improvement of process quality in Pakistan are suggested. The results from both methods are not entirely comparable; however, if one considers uncertainty in data, then the second synthetic GRA-based ranking should be preferred over RII in decision making.Originality/valueThe study is pioneer in the evaluation of key factors influencing process quality during building construction projects in Pakistan using a set of traditional and novel methods. The results of this study are significant in improving the process quality during different phases of construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.