Abstract
When culverts are installed beneath high embankments, earth loads become excessive and the induced trench construction method is a viable design option to reduce the culvert loads to acceptable levels. However, limited field studies evaluating the performance of induced trench twin culverts are reported in the literature and the practicality and effectiveness of the induced trench construction method (in general) has been subject to recent criticism. This paper describes the performance of twin 3048 mm inside-diameter reinforced concrete culverts constructed with an induced trench beneath 15.3 m of fill. Research instruments and autonomous data acquisition systems were installed during construction to monitor (i) culvert earth pressures, (ii) embankment deformations, and (iii) groundwater elevations in the vicinity of the compressible fill. The experimental observations recorded throughout the construction phase are presented herein; the embankment deformations are indicative of effective positive arching within the induced trench region, and the average earth pressure at the culvert crown was reduced to approximately 48% of the overburden soil pressure. The experimental data are compared with those reported in the literature by others, and the conclusions attained from this study demonstrate the effectiveness of the induced trench construction method.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.