Abstract

One of the new components of water conveyance system in central Iran is the Ghomroud water conveyance tunnel that is being excavated by a double shield TBM. The 36 km long tunnel mainly passes through the metamorphic weak rocks of Jurassic age. Key geotechnical design issues for the tunnel, which has up to 650 m of overburden, include the potential for high ground pressure due to high in situ stress. In order to prevent the shield jamming in these weak rocks, it was necessary to evaluate the amount of ground pressure on the outer surface of TBM shield in the vicinity of the tunnel face. The stress and strain condition in the vicinity of the tunnel face has a 3D nature and it is not realistic to assume a two-dimensional stress state at the tunnel face area. In the convergence-confinement method, it is possible to simulate the tunnel face effect with an internal fictitious pressure that is imposed on the tunnel perimeter. In this study, based on the convergence-confinement method, a new method was introduced to calculate the tunnel face effect on ground pressure distribution around the tunnel face region. Then by using this method, critical areas with potential for shield jamming was predicted along the Ghomroud water conveyance tunnel. The obtained results by this method are in good agreement with the current TBM jamming situations along the Ghomroud tunnel.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.