Abstract

In late 1987 Mount Isa Mines commissioned a circuit of 3, 2.5 × 13 m flotation columns to upgrade a bulk Pb/Zn rougher concentrate (low grade middlings). The decision was based on the results of extensive testing in a pilot unit (0.05 × 10 m), involving amenability tests and scale-up parameter estimation. The circuit has performed well and the achieved and expected metallurgy are compared. The pilot column was re-run in parallel with the flotation column circuit. This revealed the importance of operating the pilot and plant columns at similar gas rates for comparative results. The circuit generally exceeded the pilot results; possible reasons are discussed.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.