Abstract

The planning of a flood control system in Indonesia is based on the planning criteria issued by the Ministry of Public Works. Flood control planning is based on flood discharge with a specific return period depending on the order of the river and the number of protected populations. Flood events in areas where the flood control system has been planned continue to occur almost every year, meaning that the probability of being exceeded is not as planned. This study is intended to evaluate the criteria for the magnitude of the designed flood discharge in flood control planning that considers the acceptable risk. Potential risks are evaluated against system reliability. The probability of failure of the flood control system occurs if the resistance is smaller than the load expressed as a performance function. By knowing the performance function associated with the level of flood risk, then the flood discharge can be selected with the appropriate return period according to the acceptable risk.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call