Abstract

We have developed a method called PREDIQT for model-based prediction of impacts of architectural design changes on system quality. A recent case study indicated feasibility of the PREDIQT method when applied on a real-life industrial system. This paper reports on the experiences from applying the PREDIQT method in a second and more recent case study -- on an industrial ICT system from another domain and with a number of different system characteristics, compared with the previous case study. The analysis is performed in a fully realistic setting. The system analyzed is a critical and complex expert system used for management and support of numerous working processes. The system is subject to frequent changes of varying type and extent. The objective of the case study has been to perform an additional and more structured evaluation of the PREDIQT method and assess its performance with respect to a set of success criteria. The evaluation argues for feasibility and usefulness of the PREDIQT-based analysis. Moreover, the study has provided useful insights into the weaknesses of the method and suggested directions for future research and improvements.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.