Abstract

The purpose of this research is to identify the condition of highway drainage channels and evaluate the existing highway drainage network system in accommodating runoff discharge, channel dimensions and flow direction in channels that occur inundation in the Pangkajene Islands State Agricultural Polytechnic Campus area which is expected to help solve flooding problems in the area. The research method used is descriptive quantitative, which is a method of calculation and description of the results of field data processing. Secondary data collection includes; rainfall data for the last 10 years, obtained from the Department of Resources; topographic maps, drainage network maps and situation maps, obtained from the Politani Pangkep Campus planning section. Primary data collection is obtained from direct measurements in the field using a Waterpass measuring instrument to measure elevation and channel length. The results of this study found that the drainage capacity < 2-year and 5-year return period Plan Flood Discharge, so planning is needed to increase drainage capacity

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.