Abstract

ABSTRACTThis research aims to examine the efficiency of Brigjend Soediarto fly over development towards the traffic jam in Pedurungan intersection. The approach conducted in this research is quantitative paradigm, with the quantitative method in the process of analysis. According to the analysis, the recent condition indicates high traffic flows density in each intersection. The level of service (LOS) in Brigjend Soediarto road is 1,421 in the F level. It is predicted that after the development of fly over, the level of service increasse into C with LOS = 0.579. Meanwhile, the LOS in Soekarno-Hatta road is 0.854 with the D level, and increases into B level with LOS = 0.226. While LOS Fatmawati road is 0.856 with the D level and increases into B with LOS=0.284. Before the development, the vehicle speed in Pedurungan intersection was 5.914 km/hour. After the development is is predicted that the vehice speed will be 49.885 km/hour. So that the average speed is 43.97 km/hour. Based on those analysis, the efficiency of the development of Brigjend Soediarto fly over is 76.28%. It can be concluded by the development of Brigjend Soediarto fly over, it is efficiently increasing the flow of traffic in Pedurungan intersection. Keywords : Brigjend Soediarto Fly Over, Pedurungan Intersection, Traffic Delay

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.