Abstract

The extent to which the facility and the construction process meet and/or surpass a client's expectations is critical for client satisfaction. As a result, company evaluation is a well-established procedure in project management in the construction industry to ensure projects are performed in compliance with the contract documents and applicable laws and regulations. The purpose of this study is to present and debate certain criteria for evaluating the Iraqi construction sector companies’ performance based on Stepwise Weight Assessment Ratio Analysis (SWARA) to assess company responsibility and performance in support of future projects. The evaluation criteria of construction companies are studied in this paper. The criteria have been categorized into main groups: (a) organization and management; (b) time; (c) quality; (d) cost; (e) resource; (f) safety practices. The main criteria have been divided into forty-four sub criteria. The findings of this paper demonstrate that the most important criteria in evaluating the construction companies’ performance is cost, followed by time, quality, organization and management, resources, and lastly safety practices which ranked based on the weight of criteria (35.7%, 24.2%, 16.3%, 11.2%, 7.4%, 5.2% respectively) with the SWARA technique.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.