Abstract
In order to reduce the peak load in the period of power shortage through power demand side response, it is necessary to evaluate the peak cutting potential of major industries in this region. Based on electricity information acquisition system and big data mining analysis technology, this paper proposes a peak-clipping potential assessment method and process for power demand side response based on the characteristics of different industries, and evaluates and ranks the peak-clipping potential of 17 major industries in Henan Province. The evaluation method and results provide a theoretical basis for studying and judging the peak cutting scale and target in advance.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.