Abstract

A new novel approach towards Project Based Learning (PBL) was developed for design project-based learning activities. PBL activities traditionally span in duration from a few weeks to one year. The shortened PBL project was created for a half-day practical and ran in a 1st year undergraduate engineering unit. The project involved sustainable re-design of disaster- aid relief items. The project also involved students utilising interactive 3D virtual visualisation technology known as the CAVE environment as a design development tool. This paper assesses the effectiveness of the developed short project-based learning project (SPBL) at improving student engagement. Students survey responses indicated student engagement was high from participating in the short PBL activity, realism in the project played an important role. Short PBL projects can become a positive tool in teaching and learning through the maintaining of student and cognitive engagement throughout the entire duration of the project.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.