Abstract
In the present study, the operation of a multi-reservoir hydropower system is evaluated using a monthly simulation model for power production and irrigation releases. The hydropower production is assessed for two operating scenarios, namely, unconstrained and constrained scenarios based on hard bound constraint on powerhouse releases and also for various duration of hydropower plants operation. Further, the behaviour of the system is analysed using the statistical performance indices such as reliability, resilience and vulnerability. The results show that the power production is high for the unconstrained operating scenario due to unrestricted releases to the powerhouses. On the other hand, the constrained scenario has resulted in lesser but reliable steady power production irrespective of duration of operation. It is found that the power production can be increased by 14% without compromising the irrigation releases. The statistical performance analyses show that lesser the duration of operation of powerhouses, higher is the reliability and resilience with less vulnerability.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.