Abstract

Cibinong WTP using raw water sources from the Ciliwung River. Processed water from the Cibinong WTP serves 5 sub-districts, namely, Tajur Halang, Bojong Gede, Cibinong, Babakan Madang and Citereup districts. The research covered raw water quality, evaluation of the existing WTP condition and optimization of work of operation unit and process. Cibinong WTP consist of unit intake, hydraulic coagulation, hydraulic flocculation, sedimentation plate settler, rapid sand filtration, and ground reservoir. The coagulant used is 5% alum with a dose of 25 mg / L and disinfectants that use liquid gas and chlorine at a dose of 1.4 mg / L. Specifications for installation of drinking water installations use standards that are in accordance with SNI 6774 in 2008 concerning procedures for processing plant package units. Water quality in accordance with the Minister of Health Regulation 492 of 2010 concerning drinking water quality requirements. Cibinong WTP has several units that have not met the 2008 SNI 6774 standard but, the quality of the water already in accordance with the regulation of Minister of health no 492/2010.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.