Abstract
It is shown that in the conditions of low-productive carbonate deposits with hard-to-recover reserves, confined to the Middle Carboniferous deposits of the Birskaya saddle and the Perm-Bashkir arch of the Volga-Ural oil and gas province, the productivity factor determined during the well flow rate stabilization period after development largely determines the final technological development indicators. We propose geological and statistical models allowing determining the productivity values to the greatest extent reflecting the real reservoir properties at the point of opening it with a well. The obtained results make it possible to evaluate the effectiveness of measures aimed at improving the efficiency of managerial decisions to achieve the maximum return on the oil companies’ assets. Keywords: productivity factor; geological and statistical models; empirical base models, oil recovery factor; geological and physical parameters; technological development indicators.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.