Abstract

A well can be produced and exploited when it has production power, in other words, if the well does not have enough pressure, it will not be able to flow. Artificial production is a method to increase the lifespan of well production. The well studied in this article has a significant annual lower pressure drop; So now with the current pressure of the existing well, it is not possible to send the oil of this well to the separator of the first stage of the exploitation unit. Among the existing solutions to maintain or increase production and increase the flow pressure of the well, is the use of artificial extraction. In this article, an attempt has been made to simulate the effect of using a core pipe, gas pumping and installing an electric submersible pump (ESP) on the production flow rate and flow pressure of the well by using the well data and the static and current pressure test. The current production data with the PIPESIM software was checked, and then the best extraction method for the studied well. Finally, the installation of an ESP was determined and selected as the best method of artificial extraction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.