Abstract

The main reason for the failure of most of management information systems is referred to the problems that arise from management factors and strategic components, expectations, complexity, and risks. Finally, the main applicable proposal is giving importance by managers and analysts to the fit between organization and its information system as well as giving attention to training categories in implementation of information system, preparing financial supports and human resource in design, implementation, and development of information system, strengthening progressive factors, and weakening restrictive factors in organization by management to design or develop the system and finally, preparing organizational infrastructures to implement information system. Introduction of an information system has a strong managerial, organizational, and technological impact on industrial building methods. One of the objectives of this study was to identify and introduce key success factors of Project Management Information Systems (PMIS) in Industrialized Building Systems (IBS). The results of hypotheses showed that all dimensions of PMIS influence the performance of projects. But in the second phase of the study, sub-factors were classified using hierarchical analysis approach. This classification helps managers to identify the most important factors and obtain better results concentrating on the main factors compared with using PMIS.

Highlights

  • Nowadays, constructions in Iran are passing from the traditional stage to industrial stage

  • The findings showed that according to the summary of executive problems of industrial construction workshops in industrialized systems, it becomes clear that project control and planning system, in addition to the building components, should include management, support, and financial components

  • The results showed that building industry is one of the main economic sectors of each country that is responsible for a major part of Gross Domestic Product (GDP) and employment

Read more

Summary

Introduction

Constructions in Iran are passing from the traditional stage to industrial stage. It is obvious that taking advantage of modern building technologies and using project management methods in this field can facilitate the achievement of goals. According to the executive problems of industrial construction workshops in industrialized systems, it can be observed that project control and planning system, in addition to construction components, should include management, support, and financial system. Namdar et al [1] conducted a study on planning and controlling building projects based on industrialized methods. The findings showed that according to the summary of executive problems of industrial construction workshops in industrialized systems, it becomes clear that project control and planning system, in addition to the building components, should include management, support, and financial components.

Objectives
Methods
Results
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.