Abstract

PurposeThe purpose of the study is to elicit risk factors that are peculiar to public-private partnership (PPP)-procured mass housing in Nigeria from the expert perspectives in ensuring the success of the scheme thereby reducing housing deficit in the country.Design/methodology/approachThe risk inherent in construction projects had been established through literature in general. The risk in PPP projects is emerging because of the recent acceptance of the procurement option by governments all over the globe. The Nigerian Government has also adopted the procurement option in bridging the housing deficit in the country. This study, therefore, conducts a Delphi survey on the probability of risk occurrence peculiar to PPP mass housing projects (MHPs) in Nigeria. Pragmatic research approach through the mixed method of both quantitative and qualitative methods was adopted for this study. The quantitative method adopts the administration of questionnaires through the Delphi survey, whereas the qualitative method used interviews with the respondents. A two-stage Delphi questionnaire was administered to construction practitioners that cut across academics, the public and the private sectors by adopting convenient sampling techniques and following the Delphi principles and procedures. A total of 63 risk factors were submitted to the expert to rank on a Likert scale of 7 and any risk factors that the mean item score (MIS) falls below the grading scale of the five-point benchmark is deemed not necessary a risk factor associated with PPP MHPs and thereby expunged from the second round of the Delphi Survey. The interview was subsequently applied to the respondents to substantiate the risk factors that are peculiar to PPP-procured mass housing in the study area.FindingsThe findings show that risk factors such as maintenance frequent than expected, life of facility shorter than anticipated and maintenance cost higher than expected fall below 5.0 benchmark with MIS of 4.64 and 4.55 indicating that the risk factors are not peculiar to PPP mass housing in Nigeria.Research limitations/implicationsThe implication for practise of this research is that these risk factors provide the PPP stakeholders with the comprehensive checklists that can aid in developing PPP risk assessment guidelines in the sector though both partners should be aware of the dynamic nature of risk because new ones might be emerging.Originality/valueThe authors hereby declare that the research findings are a product of a thorough research conducted in the study area and have not to be submitted or published by another person or publisher and due acknowledgement was made where necessary.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call