Abstract

During the road construction, the road capacity would be affected by the construction activities. Moreover, unreasonable traffic organization in construction area not only aggravate the decline of road capacity, but also greatly affect the operation of surrounding traffic. Thus, it is necessary to optimize the traffic organization with construction activities, including optimize the signal timing scheme of intersections and analyze the impact of construction area design. First, taking the construction of Metro Line 6 in Chengdu, China as the studying case, the signal timing is optimized with the minimization of vehicles delay as the optimization objective. Then, a comprehensive sensitivity analysis of the size of working area and the length of transition area is further performed. The results show that the length of construction working area should be set as short as possible, while the transition area has the least impact on traffic operation when its length is set at 50m ~ 60m. Meanwhile, with the increase of the length of the construction area, the intersection with higher green letter ratio would be less sensitive to the changes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.