Abstract

The major objective of engineering change is to redesign product/component parts to perform better or to be produced more efficiently. However, frequent engineering changes contribute to scheduling instability. When a material requirements planning (MRP) system is used as the production planning and inventory control method, scheduling instability becomes the most difficult problem for production planners to deal with. The purpose of this paper is to evaluate the trade-off between frequent engineering changes and resultant cost increments in writing off obsolete items. A simulation experiment is conducted to examine the effect of different frequencies of engineering changes on the performance of a multi-level MRP system under various operating environments. An analysis is also performed to evaluate the sensitivity of base experimental results to changes in important parameters which are held constant in the simulation experiment. Results show that frequent engineering changes indeed deteriorate MRP system...

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.