Abstract

AbstractThe German offshore wind energy production will be largely expanded in the next years. As a test. the first offshore wind turbines in German waters were installed in 2009 at the “alpha ventus” wind farm site off the island of Borkum in the southern German Bight. The whole process is accompanied by environmental impact assessments (EIAs) covering all marine taxa and other relevant aspects such as noise emissions. A regulatory framework for conducting these investigations, the so-called StUK 3 (Bundesamt für Seeschifffahrt und Hydrographie [BSH] 2007), is set by the permitting agency (BSH [Federal Maritime and Hydrographic Agency]). To evaluate whether these requirements are appropriate and lead to scientifically robust results, a comprehensive research study was conducted simultaneously at a larger scale and by using methods additional to the ones of the EIA studies. The aim of these investigations was to validate the existing requirements or improve methodologies and the scope of their use wherever appropriate.KeywordsEnvironmental Impact AssessmentOffshore WindHarbor PorpoiseOffshore Wind TurbinePile DrivingThese keywords were added by machine and not by the authors. This process is experimental and the keywords may be updated as the learning algorithm improves.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.