The establishment of stability in rivers is dependent on a variety of factors, and yet the established stability can be interrupted at any moment or time. One factor that can strongly disrupt the stability of rivers is the construction of dams. For this study, the identification and evaluation of morphological changes occurring to the Karkheh River, before and after the construction of the Karkheh Dam, along with determining the degree of changes to the width and length of the downstream meanders of the river, have been performed with the assistance of satellite images and by applying the CCHE2D hydrodynamic model. Results show that under natural circumstances the width of the riverbed increases downstream parallel to the decrease in the slope angle of the river. The average width of the river was reduced from 273 meters to 60 meters after dam construction. This 78% decrease in river width has made available 21 hectares of land across the river bank per kilometer length of the river. In the studied area, the average thalweg migration of the river is approximately 340 meters, while the minimum and maximum of river migration measured 53 and 768 meters, respectively. Evaluations reveal that nearly 56% of the migrations pertain to the western side of the river, while over 59% of these migrations take place outside the previous riverbed. By average, each year, the lateral migration rate of the river is 34 meters in the studied area which signifies the relevant instability of the region.

Highlights

  • After the construction of any dam, the fluvial regime of the river is subjected to consequential change and its system or pattern of erosion may undergo metamorphosis

  • The analysis of results shows that there is an average lateral migration of 34 meters occurring to the river each year, in the studied district, which signifies the instability of the region

  • Significant changes occurred after the construction of a dam

Read more

Summary

Introduction

After the construction of any dam, the fluvial regime of the river is subjected to consequential change and its system or pattern of erosion may undergo metamorphosis. Dam construction alters the amount of sediment production, retention and transportation of the sediments in the system This causes changes in the pattern of erosion and can alter the channel’s morphology in both short and long term periods. It can further change the morphological qualities of the bed and banks, which influence the amount of water transportation and the rise and fall in the elevation of the bed, resulting in the spread of flooded regions surrounding the river. The change in the direction of meanders is one of the most prominent problems regarding the instability of rivers. Due to the continuous change in the bend’s radius of curvature, fluvial parameters are more complex in meander sections than in straight river sections [2]

Objectives
Methods
Results
Conclusion
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.