Abstract

Tests for evaluating the effect of primary and automatic secondary frequency control on the reliability and economic efficiency of thermal condensation power generator units with flow-through boilers are described briefly. The results of these tests serve as initial data for the development of a method of estimating the consequences and additional expenses involved in bringing thermal power generator units into operation in these frequency regulation modes.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call