Abstract

The evaluation of multi-step-ahead density forecasts is complicated by the serial correlation of the corresponding probability integral transforms. In the literature, three testing approaches can be found which take this problem into account. However, these approaches can be computationally burdensome, ignore important information and therefore lack power, or suffer from size distortions even asymptotically. In this work, a fourth testing approach based on raw moments is proposed. It is easy to implement, uses standard critical values, can include all moments regarded as important, and has correct asymptotic size. It is found to have good size and power properties if it is based directly on the (standardized) probability integral transforms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.