Abstract

Many infrastructure managers have the goal to increase the capacity of their railway infrastructure due to an increasing demand. While methods for performance calculations of railway line infrastructure are already well established, the determination of railway junction capacity remains a challenge. This work utilizes the concept of queueing theory to develop a method for the capacity calculation of railway junctions, solely depending on their infrastructure layout along with arrival and service rates. The implementation of the introduced approach is based on probabilistic model-checking. It can be used to decide which infrastructure layout to build, i.e. whether an overpass for the analysed railway junction is needed. The developed method addresses the need for fast and reliable timetable-independent railway junction capacity evaluation, catering specifically to the long-term strategic planning of junction infrastructure.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.