Abstract

Line planning is an early step in the planning process in public transportation, usually followed by designing the timetable. The problems related to both steps are known to be NP-hard, and an integrated model finding a line plan and a timetable simultaneously seems out of scope from a computational point of view. However, the line plan influences also the quality of the timetable to be computed in the next planning step. In this paper we analyze the impact of different line planning models by comparing not only typical characteristics of the line plans, but also their impact on timetables and their robustness against delays. To this end, we set up a simulation platform LinTim which enables us to compute a timetable for each line concept and to experimentally evaluate its performance under delays. Using the German railway intercity network, we evaluate the quality of different line plans from a line planning, a timetabling, and a delay management perspective.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.