Abstract

Job scheduling plays a critical role in the utilisation of grid resources by mapping a number of jobs to grid resources. However, the heterogeneity of grid resources adds some challenges to the work of job scheduling, especially when jobs have dependencies which can be represented as Direct Acyclic Graphs (DAGs). It is widely recognised that scheduling m jobs to n resources with an objective to achieve a minimum makespan has shown to be NP-complete, requiring the development of heuristics. Although a number of heuristics are available for job scheduling optimisation, selecting the best heuristic to use in a given grid environment remains a difficult problem due to the fact that the performance of each original heuristic is usually evaluated under different assumptions. This paper evaluates 12 representative heuristics for dependent job scheduling under one set of common assumptions. The results are presented and analysed, which provides an even basis in comparison of the performance of those heuristics. To facilitate performance evaluation, a DAG simulator is implemented which provides a set of tools for DAG job configuration, execution, and monitoring. The components of the DAG simulator are also presented in this paper.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.