Abstract
Indonesia, a country rich in geothermal resources, has yet to fully exploit its potential, particularly in volcanic regions like Mount Seulawah Agam. This study investigates the application of the Additive Ratio Assessment (ARAS) method for the site selection of Geothermal Power Plants (GPP) in Indonesia. The ARAS method provides a systematic approach to evaluating and prioritizing geothermal development sites by integrating multiple criteria, including geological, environmental, and socio-economic factors. The study collects data from various sources and weights criteria using the Ordinal Priority Approach (OPA), incorporating expert opinions. The findings demonstrate the effectiveness of the ARAS method in identifying optimal locations for GPP development, ensuring sustainability and feasibility. The study also tests the ARAS method in existing GPP locations in Jaboi, Sabang, Indonesia, to investigate alignment with the results and validate the approach. Furthermore, the study presents recommendations for GPP site selection. This research emphasizes the significance of multi-criteria decision-making techniques in facilitating renewable energy projects. It promotes a more systematic and informed approach to geothermal energy development in Indonesia and other geothermal-rich regions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.