Abstract

Mud hydraulics on a 12-1/4" section needs to be planned properly. Mud hydraulics design on a 12-1/4" section includes determining mud density, flow type, pressure loss, pump specifications, bit hydraulics and cutting lifting design. The purpose of bit hydraulics design is to determine the optimum flow rate. Mud hydraulics optimization is carried out using methods the Bit Hydraulic Horse Power (BHHP), Bit Hydraulic Impact (BHI) and Jet Velocity (JV) methods, where the analysis is in the form of graphs. The graph is analyzed by using a trial and error method to obtain the recommended flow rate so as to provide good cutting lifting. where the expected recommendation analysis are Cutting Transport Ratio (Ft) > 90%, Cutting Concentration (Ca) < 5%, and Carrying Capacity Index (CCI) > 1. The analysis results from the graph show that for the hole 12-1/4", it is recommended to use an optimum flow rate of 626.6 gpm with minimum value of Ft is 90.01%, Ca is 0.87% and CCI is 1.95. These values are stated to be good by using 15-15-16 nozzle bit combination. The Flowrate value can be increased up to 785 gpm by using 18-18-20 nozzle bit combination.. Keywords: Hydraulic Mud Planning, Optimum Flow Rate, Cuttings Removal.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.