Abstract

Evaluation of blast performance is considered of high interest for mine operators to improve blasting results. Within the scope of this study, the aim is to determine the optimum blasting conditions in Tourah-quarry, Helwan, Egypt. Guidelines have been suggested for a step-by-step trial blasts to evaluate blasting results in Tourah quarry. Thirty full scale production blasting events in Tourah quarry have been conducted and the results have been recorded. Two design parameters have been investigated. These parameters are initiation point and primer location inside the blast hole. The objective has been achieving optimum blast results: adequately displaced and swelled muck pile; desired fragmentation degree; less uneven rock face and minimum environmental problems such as ground vibrations, and flying rock.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.