Abstract

PT Mandiri Karya Makmur is a private mining company that mine granite rock located in CentralBangka Regency Area.The main activity in extracting granite rock was conducted using blastingmethod. Blasting acitivy could influence invironment around mine site, including community.Therefore, it was necessary to evaluate blasting activity, especially tie-up to decrease vibration fromblasting activity itself. The method used to make design of tie-up was using shotplus-i program. Theaims in this research was to set up surface delay and the use of time window in order to determineamounts of similar blasting holes. The data used including sounding data and blast design todetermine PPV value. The value was calculated by using empirical formula of U.S.B of Mine No 656 of1971. The actual geometry used including burdens 1,8 m, spacing 2,3 m and hole depth rate 6 m.Then, determining the measurement of vibration was using Android based vibrometer. The result ofappropriate tie-up evaluation used in blasting was Box cut pattern, surface delay 25 ms and 42 mswith inisiation of left corner using time window 8 ms and similar blasting holes was 3 holes. Thisamount could minimize vibration. Actual PPV value was 0,7 mm/s, PPV recommendation value of 3,3mm/s and SD value of 19,6 m/kg. The cavacity of explosive was 932 kg and minimum safe distance of598 m from blasting point. It was categorised still safe referring to Building type theory of number 2(SNI 7571 : 2010).

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.