Abstract

PT. FACO Global Engineering is a national company that manufactures Transformer Tank.The problems that arise on the production floor in Workshop 3 is a common difficulty in achievingproduction targets precisely at the appointed time this problem may be related to its unbalancedproduction line .. Average yield Transformer Tank produced today is 1 unit per week, while theproduction target set is 2 units per week.The methodology used is to use the simulation. The data obtained was then calculated andanalyzed the workload of each station. Utility work station is currently the largest existing utilities inthe workstation and welding with a cutting wheel percentages respectively 91.65% and 76.45%. Forutility work station is the smallest percentage of work stations fullfitting with 3.76%. This can beovercome by the proposed model are given 6. Model 2 the best proposal is the transfer station operatorto work painting and cutting wheel 1 fullfitting operator work station to drilling.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.