Abstract

The European climate policy targets until 2050 require an adaption of the generation portfolio in terms of renewable and fossil based generation. Assumptions on the timeline of the targets and the availability and costs of generation technologies are used in energy system models to optimize the cost minimal system transformation. The results include investments in generation technologies and their national allocation. Yet, the models are limited to the national aggregation and lack the spatial resolution required to represent individual network investments and related costs. In this paper, we analyze the impact the results of an energy system model have on demand for network expansion in the European power grid in a line-sharp representation. A cost minimizing mixed-integer problem (MIP) model calculates where in the European electricity grid extension needs to take place for different time steps (2020/30/40/50) in order to obtain the minimization of total costs for power plant dispatch and grid expansion. Scenarios based on the generation infrastructure options from the PRIMES EU-wide energy model scenarios invoke different expansion needs and a comparison is conducted. The model allows investments in the AC network and an overlay DC grid. Resulting investment costs are compared to the numbers of the European Energy Roadmap 2050.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call