Several optimization studies were made to increase metal recovery and reduce operational costs of the concentrator in Siirt Madenköy copper mine. In consequence of these studies, effects of the changes in operating parameters, cost and plant recovery will be examined at this article. In this article, we will discuss two important revision studies, which are: - Replacement of 500 mm hydrocyclone set used in ball mills with 350 mm of hydrocyclone set. - Replacing the present Ball Mill with a SAG mill. Correspondingly elimination of the crushing and screening plant. - Increasing the scavenger cells from 4 to 6 by the addition of 2 more cells. In consequence with this feeding the middling tail to the increased scavenger cells which was treated as a part of final tail before this change. We will examine the effect of all these changes to the final recovery, concentrate grade and final cost.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.