Abstract

For single and multi-machine scheduling problems with the criterion of minimization maximum lateness the metrics ρ has been used for the first time. A theorem of estimating the absolute error has been proved. The idea of the offered approach consists in construction by an initial instance of a problem of other instance for which it is possible to find the optimum or approximated solution, with the minimal distance up to an initial instance in entered metric.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.