Abstract

The BeiDou Global Satellite Navigation System (BDS-3) broadcast newly developed B1C and B2a signals. To provide a better service for global users, the vertical phase center offset (PCO) and phase center variation (PCV) are estimated for the B1C/B2a ionospheric-free linear combination of the BDS-3 inclined geostationary orbit (IGSO) and medium earth orbit (MEO) satellites in this study. And considering the traditional PCC estimation method needs two Precise orbit determination (POD) processing, based on the correlation between PCO z-offset and PCV, the theoretical analysis and experimental comparison have been made to discuss whether the POD procedure for the PCO estimation can be omitted. The estimated z-offset time series revealed the inadequacy of the solar radiation pressure (SRP) model for the IGSO satellites and the MEO satellites with Pseudo Random Noise code (PRN) C45 and C46. The PCVraws estimated by the traditional method and the PCO estimation omitted method have the same characteristic. The final PCO z-offsets and PCVs calculated by the two schemes agreed very well with differences can be harmlessly ignored, which confirmed that the PCO estimation can be safely omitted to save computation time. The PCC model proposed in this study has been compared with the Test and Assessment Research Center of China Satellite Navigation Office (TARC/CSNO) released model, the qualities of the orbits and BDS-only precise point positioning (PPP) solutions of the new model both show improvements, except for the IGSO orbits. The analysis of the IGSO orbits further verifies the SRP model is not suitable for the IGSO satellites.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call