Abstract
Estimation of the worst-case execution time (WCET) of programs is an important problem for the development of real-time systems. In particular, the estimation of the WCET is a goal in the verification of aeronautical software specified in DO-178B/C. This is a difficult problem, and its exact solution is often practically impossible. This problem has been studied for many years; as a result, a lot of techniques for various cases have been developed. A survey of the available techniques for estimating the WCET is presented, which can be useful for choosing methods for solving particular problems.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.