Abstract

Knowing the time of a process change could lead to quicker identification of the special cause and less process down time, as well as help to reduce the probability of incorrectly identifying the special cause. In this article, we propose the maximum likelihood estimator (MLE) for the process change point when a control chart with the fixed sampling rate (FSR) scheme or the variable sampling rate (VSR) scheme is used in monitoring a process to detect changes in the process mean and/or variance of a normal quality variable. We investigate the performance of this estimator when it is used in various types of control charts.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.