Abstract

Abstract Estimating the probable maximum precipitation (PMP) is necessary to calculate the probable maximum flood (PMF). It is of high importance in checking the adequacy of dam overflow capacity and other development and water transfer plans of a given area. In this research, using the for an annual 24-hour maximum rainfall data set of 45 synoptic stations throughout the country, the PMP values were calculated through the original Hershfield method and then the Hershfield-Desa method. By comparing the obtained results of 24-hour PMP estimation through the two mentioned methods, it is found that the estimation of PMP values in the original/first Hershfield method is well higher than the expected value (2.54 to 4.03). While in the modified method (Desa method), PMP values are significantly reduced and seem more reasonable (1.02 to 1.3). Meanwhile, the calculated variability and skewness coefficients also indicated more variability of PMP values in the southern stations of the country compared to rainy regions, which makes the estimation of PMP in the southern regions of the country considerably unreliable.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.