Abstract

Tasks involved in determination of the NPP equipment failure risks in the process of long-term operation are of extreme importance nowadays, specifically as the NPP units in the Russian Federation are nearing the end of their design lifetimes (25–30 years) and the life of newly built NPPs is increased to 60 years. The end of the effective NPP lifetimes and the increase in the operating life for newly built NPPs dictate the need for new approaches to be developed to ensure safe and reliable operation of critical thermomechanical components and pipelines. One of such components is the weld assembly between the hot header and the steam generator shell (WJ 111), in which formation and high-rate development of in-service defects is possible; the defects being systemic and affecting the operating safety of the entire power unit. Statistics is presented on failures in the weld assembly between the SG hot/cold headers and the DN-1200 piping for WWER reactors. Classification is proposed for the occurrence of limiting failure states for the SG weld assembly. The risk has been calculated for a power unit in the event one of the limiting states occurs. The losses resulting from damage to the SG header—nozzle weld assembly in the WJ 111 area is substantial. The probability of intolerable defects in the WJ 111 area remains high, so measures are required to control their formation time and development process.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.