Abstract

PurposeBuilding cost is an important part of construction projects, and its correct estimation has important guiding significance for the follow-up decision-making of construction units.Design/methodology/approachThis study focused on the application of back-propagation (BP) neural network in the estimation of building cost. First, the influencing factors of building cost were analyzed. Six factors were selected as input of the estimation model. Then, a BP neural network estimation model was established and trained by ten samples.FindingsAccording to the experimental results, it was found that the estimation model converged at about 85 times; compared with radial basis function (RBF), the estimation accuracy of the model was higher, and the average error was 5.54 per cent, showing a good reliability in cost estimation.Originality/valueThe results of this study provide a reliable basis for investment decision-making in the construction industry and also contribute to the further application of BP neural network in cost estimation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.