Abstract
This paper presents a qualitative risk assessment tool based on fuzzy set theory to estimate the amount of activity duration overrun under the combinatory effect of multiple risk factors. Applying proposed methodology, a set of duration modifiers to calculate the optimistic, most-likely and pessimistic duration values under uncertainty are calculated. To elaborate the methodology, a simulated bridge project with ten risk factors affecting activities duration is presented. Proposed model contributes to knowledge that could help minimize the schedule overrun and improve risk mitigation strategies through providing risk-based duration estimates instead of discrete values. Advantages of the developed approach compared to existing models include (1) considering the combinatory effect of multiple risk factors on activity duration, (2) accounting for uncertainty in experts’ evaluations by employing the interval-valued fuzzy numbers, and (3) utilizing a discrete fuzzy weighted average algorithm which avoids creation of incorrect fuzzy membership functions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Project Management and Productivity Assessment
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.