Abstract

Each equipment plays an imperative function and its malfunction leads to heavy cost and plant development. The current study is resolute on base-rate estimation of breakdowns of boilers at sugar plant (capacity – 2,500 tons crushed per day) under different set of parameters. It is relatively difficult to guesstimate the base rate, as one knows hardly the expenses incurred following a breakdown in terms of many associated expenditures. To estimate the base rate, a preemptive goal programming (GP) model is formulated that considers all major influencing factors. With any change in factors, maintenance time also gets pretentious. However, these factors are further sub-levelled for a very precise inference of optimal maintenance time. Additional constraints are obtained by providing priority-based benchmark jobs. Finally, the model is worked out within 3% variation from the benchmark jobs involved.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.