Abstract

Transport project prioritisation and selection processes require consideration of many aspects of costs, intended benefits and other impacts. Economic analysis methods can measure many of those factors, though the analysis methods must be specified in ways that meet the information needs of decision-makers. This chapter examines how cost-benefit analysis, economic impact analysis and multi-criteria analysis approaches have evolved and been applied to address the specific form of governmental decision processes that exist in the U.S. and some other countries. It discusses how “ex-post” case studies and associated statistical studies of have been promoted and utilised to both inform and refine “ex-ante” evaluation methods. It concludes by discussing the advantages, limitations and trade-offs involved in the use of this approach for transport project decision making.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.