Abstract
A modification to the load factor approach to estimating undrained volume loss for open-face tunnelling in London Clay is proposed. The modified approach is based on the nature of ground movement observed during construction of the Jubilee Line Extension at St James's Park and Elizabeth House for different stages of open-face shield tunnel construction and tunnelling using sprayed concrete linings, described in a companion paper. The new approach is shown to provide good estimates of the volume loss observed for open-face shield tunnelling in London Clay at Green Park and Regents Park.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.