Abstract

Ever since large dams and reservoirs were first constructed, extreme flood estimates have been produced for use in designing spillway capacities. For this purpose, the National Weather Service, the Corps of Engineers, and the Bureau of Reclamation have codified a methodology to estimate an extreme flood, which is commonly referred to as the Probable Maximum Rainfall and resulting Probable Maximum Flood event. The combined method uses historic data to extrapolate meteorologic and hydrologic conditions to extreme levels to produce the maximum flood estimates. As more data are collected, the estimates of the higher limits of extreme floods have increased.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.