Abstract
The offsite financial consequences of a severe accident at the Pickering Nuclear Generating Plant in Pickering, Ontario, are estimated with use of the Melcor Accident Consequence Code System (MACCS) developed at Sandia National Laboratories (Alberquerque, NM). Although the consequences of an accident have implicitly been included in developing the Canadian Nuclear Liability Act, no detailed study of these consequences has ever been conducted except by Ontario Hydro, a public utility and a branch of the Ontario Ministry of Energy with responsibility for nuclear power planning and development in the province of Ontario. The MACCS model was adapted to the southern Ontario case and run over a range of weather and source-code scenarios for a region with a 100 km radius around Pickering. Estimates were made of the health and property-damage consequences of an accident under these scenarios, with varying evacuation and dose threshold assumptions. While the results show a wide range of possible damages, they indicate that the liability limits set in the Nuclear Liability Act may be too low.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.