Abstract
We have developed a technique and a programming-computing suite (PCS) to estimate the effect of equipment reliability indices, schedules, and regular overhaul scopes on reliability and efficiency of combined heat and power plants (CHPPs). We describe the approach to predict heat and electric loads for the investigated CHPP operation period, taking into account the features of the power cogeneration. We performed optimization studies of two operation periods (different in overhaul resources) for an industrial-heating CHPP.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.