Abstract

When a control chart signals an out-of-control condition, knowing when the process has really changed (the change point) accelerates the identification of the source of special causes and makes the corrective measures to be taken sooner. In this paper, a new multi-attribute T2 control chart based on two transformation methods is initially proposed to monitor the parameter vector of multi-attribute Poisson processes. Then, the maximum likelihood estimators (MLE) of the process change point designed for both linear trend and step change disturbances are derived. Next, using Monte Carlo simulation, we show the performances of the proposed estimators are satisfactory. Finally, through performance comparisons, we conclude the MLE of the change point designed for linear trends outperforms the MLE designed for step changes when a linear trend disturbance is present and conversely, the MLE of the change point designed for step changes outperforms the MLE designed for linear trend disturbances when the real change type is step change.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.