PurposeRecently, there has been increased interest in the use of simulation for real‐time planning, scheduling, control of construction projects and obtaining optimum productivity. The purpose of this case study is to demonstrate the use of simulation as an effective tool for estimating production rates in an attempt to prepare optimal time schedules.Design/methodology/approachGaza Beach‐Camp Shore Protection Project was taken as a case study. The case study is used to demonstrate how to estimate effectively the production rates of labour and equipment during the implementation of the project activities and to estimate the duration of the project using process simulation. The model simulates the construction of 1,600 m of gabions divided into 32 identical stations. Probabilistic distribution functions were used to fit the time functions for each process and sub‐process based on 100 replications.FindingsThe simulation output generated three probabilistic values for completing each activity upon which the overall project completion time is determined. The resources utilizations for all processes were also generated and used in the determination of the average production rates.Originality/valueThe computation of productivity based on effective resources utilization has been demonstrated to give better results than estimating productivity based on aggregate resources assignments.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.