Abstract

Introduction of the EU Landfill Directive is having a significant impact on waste management in the UK and in other member states that have relied on landfilling. This paper considers the length of the aftercare period required by the municipal solid waste streams that the UK will most probably generate following implementation of the Landfill Directive. Data were derived from literature to identify properties of residues from the most likely treatment processes and the probable management times these residues will require within the landfill environment were then modelled. Results suggest that for chloride the relevant water quality standard (250 mg l−1) will be achieved with a management period of 40 years and for lead (0.1 mg l−1), 240 years. This has considerable implications for the sustainability of landfill and suggests that current timescales for aftercare of landfills may be inadequate.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.